MODULAR
SHOWER BLOCKS

Activity centres

Activity centre shower buildings for whole groups at once

When a coach-load of students comes off the water or the trail together, you need real shower capacity. We design multi-module shower and changing buildings for exactly that.

Interior of a modular shower room with cubicles and grey PVC wet-room flooring

Built for group peaks

Activity, adventure and outdoor education centres, watersports and surf facilities, cycling and MTB centres, scout and guide centres and youth camps all share one challenge: large groups needing to shower within a short window.

  • 8 shower facility concepts
  • 12 shower facility concepts
  • 16 shower facility concepts
  • Changing + shower facilities with drying and kit space

Experience with larger facilities

We have previously quoted for large shower requirements, including a 16-shower facility using multiple modules. Project details will be published here once confirmed.

Separating wet and dry

Wetsuits, muddy kit and boots change the layout. We plan where groups enter, where wet kit goes and how changing relates to showers, so the building works on a busy day.

Popular shower facilities

Floor plan on request

2 Shower Building

Compact shower provision for small clubs, glamping and staff welfare.

Showers
2
Changing
Optional
Toilets
Optional
Module
Confirmed by layout

£2,000 showers + VAT, plus module shell(s)

Get a quote for this
Floor plan on request

4 Shower Block

Our reference pricing example: a P600 module with four showers.

Showers
4
Changing
Not included in base price
Toilets
Optional
Module
P600

Indicative from
£10,500 + VAT

Get a quote for this
Floor plan on request

6 Shower Block

A common size for clubs, campsites and activity groups.

Showers
6
Changing
Optional
Toilets
Optional
Module
Confirmed by layout

£6,000 showers + VAT, plus module shell(s)

Get a quote for this

Common questions

Can multiple modules be joined together?

Yes. Modules can be joined end-to-end to increase length, side-by-side to increase depth, or combined into larger multi-room buildings. This is how larger shower and changing facilities are created from the same module system.

What flooring is used in wet areas?

Wet-room areas use 3mm PVC flooring. Composite flooring is generally standard elsewhere where appropriate.

What size shower block do I need?

Start with how many people will need to shower at the same time and whether they change in the building. We use that to propose the number of showers, rooms and modules.

Related facilities

Get your free floor plan & quote

Answer a few quick questions — about 60 seconds. Free CAD floor plan, no obligation. Finance available.

Get my free floor plan & quote
Get a free quote